16 Apr Workload
Workload
16 April 2015
We have quite some setbacks this spring. We even had to go back in the dry dock, but now we are back in the Binnen Kalkhaven in Dordrecht. We continue with the installing the engine. On the inside the ship starts to look a little better too. Some piping and tank fittings, in very difficult places, have been replaced and the floors are closed again. In the galley we are installing a new combi-steamer and we’re making some extra cabinets to create more storage spac.e. The repair of the wheelhouse is finished and we put the navigation equipment back in place. On deck there are much less rust spots and we keep painting steadily with this beautiful weather. In short, we are on our way up.