14 Sep To the dry dock
To the dry dock
14 September 2015
After a week in Rotterdam, where we removed some cabins, we left for Lauwersoog. Twenty-four hours on a very calm sea. Even the wind cooperated and blew us as in the right direction. This afternoon (Sunday) we moored close to the dock and we are making the ship ready for the coming weeks.
The gaff sail and jib are covered with a hood, the jibs are removed and also the square sails will be removed.
Tomorrow morning at high tide, around eleven o’clock, we will go into the dock. Then we continue with the removal of the pipes and tanks so work can be done on the bottom of the ship.